摘要 内蒙古高寒地区某110kV高压输电线路架空地线发生断裂。通过宏观分析、断口分析、金相检验、力学性能试验、接续管压接质量检验等方法对架空地线的断裂原因进行了分析。结果表明:架空地线钢丝表面存在脱碳层,且脱碳层内存在大量裂纹,严重降低了钢丝的疲劳抗力;架空地线接头压接质量不合格,接续管弯曲变形严重,接续管端口与架空地线钢丝接触部位产生了较大的疲劳应力,二者共同作用使得架空地线钢丝表面形成微动疲劳裂纹,最终导致架空地线断裂。 Overhead ground wire of a 110 kV high voltage transmission line fractured in alpine region of Inner Mongolia.The fracture causes of overhead ground wire were analyzed by means of macroscopic analysis,fracture analysis,metallographic examination,mechanical property test and crimping quality examination of splice tube.The results show that there was a full decarburization layer on the steel wire surface of the overhead ground wire,and there were a lot of cracks in the decarburization layer,which seriously reduced the fatigue resistance of the steel wire.The joint crimping quality of the overhead ground wire was unqualified,the bending deformation of the splice tube was serious,and a large fatigue stress formed at the contact part between the end of the splice tube and the overhead ground wire.The combination of the two caused fretting fatigue cracks on the surface of the steel wire of the overhead ground wire,which eventually led to the fracture of the overhead ground wire.
作者 张涛 谢利明 乔欣 张雪超 谭晓蒙 孙云飞 ZHANG Tao;XIE Liming;QIAO Xin;ZHANG Xuechao;TAN Xiaomeng;SUN Yunfei(Inner Mongolia Electric Power Research Institute,Huhhot 010020,China)
出处 《理化检验(物理分册)》 CAS 2020年第2期31-34,43,共5页 Physical Testing and Chemical Analysis(Part A:Physical Testing)
基金 内蒙古电力公司2018年科技项目(510141180016).
关键词 架空地线 接续管 压接质量 全脱碳层 微动疲劳 overhead ground wire splice tube crimping quality full decarburization layer fretting fatigue
  • 相关文献

参考文献3

二级参考文献42

  • 1张勇.输电线路风灾防御的现状与对策[J].华东电力,2006,34(3):28-31. 被引量:88
  • 2谢强,李杰.电力系统自然灾害的现状与对策[J].自然灾害学报,2006,15(4):126-131. 被引量:205
  • 3李宏男,白海峰.高压输电塔-线体系抗灾研究的现状与发展趋势[J].土木工程学报,2007,40(2):39-46. 被引量:142
  • 4SimiuE ScanlanRH 刘尚培 项海帆 谢霁明译.风对结构的作用[M].上海:同济大学出版社,1992.229-263.
  • 5Smith B W. A review of dynamic aspects of transmission line design[J]. Engineering Structures, 1993, 15(4): 271-275.
  • 6Momomura Y, Marukawa H. Full-scale measurements of wind-induced vibration of a transmission line system in a mountainous area[J]. Journal of Wind Engineering and Industrial Aerodynamics, 1997(72): 241-252.
  • 7Mehta K C, Kadaba R. Wind induced response of transmission line conductors[J]. Recent Advances in Wind Engineering, 1989(2): 748-755.
  • 8国家电网公司.国家电网总体规划设计(2009年版)[R].北京:国家电网,2010.1.
  • 9元复兴,张文兵,楼钢,等.关于台风对输变电设备造成破坏和影响的专题调研报告[C]//自然灾害对电力设施的影响与应对研讨会.北京:中国电力科学院,2008:102-105.
  • 10住房与城乡建设部.110kV-750kV架空输电线路设计规范(GB50545-2010)[S].北京:中国计划出版社,2010.

共引文献39

同被引文献56

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部