摘要
从流域降雨量、进库站径流量、汛期隶属度等三个方面分析论证了漳泽水库主汛期分期时间节点,分析表明应适当延长漳泽水库的主汛期时间,缩短前汛期时间,将现在主汛期开始时间7月15日往前推移,结束时间保持8月15日不变.
This paper analyses and demonstrates the staging time node of Zhangze Reservoir in the main flood season from three aspects:rainfall in the basin,inflow of reservoir station and membership degree of flood season.The analysis shows that the main flood season time of Zhangze Reservoir should be appropriately prolonged,the Pre-flood season time should be shortened,and the starting time of the main flood season should be pushed forward from July 15,and the ending time should remain unchanged on August 15.
出处
《山西水利科技》
2019年第2期64-66,共3页
Shanxi Hydrotechnics
关键词
漳泽水库
主汛期
分期时间
Zhangze Reservoir
main flood season
staging time