摘要
In the process of construction and operation, large volume concrete structures often generate large temperature stress, which in turn leads to cracks. Before the construction of concrete structures, in order to select timely and reasonable temperature control and crack prevention measures, this paper takes the upper lock head of the Datengxia Water Control Project as an example, and uses three-dimensional finite element method to simulate and recheck and calculate the temperature field and creep stress field according to the construction progress, latest material parameters and accurate boundary conditions. The analysis results show that the overall stress of the concrete at the upper gate head is not large after the temperature control measures formulated in this paper are adopted, which meets the requirements of concrete crack prevention, indicating that the temperature control measures formulated are appropriate.