摘要
既有站的改造是哈尔滨轨道交通一号的重点、难点,本文对既有站的各种方案进行了分析,找出各种方案的优劣,选出最佳方案,同时对其它既有站的设计有指导意义.
The reconstructions of building up stations are the difficulties and emphases in Ha Erbin subway 1.This article analyzes schemes of one building up station,finds out relative merits of schemes,and then chooses the best scheme.At the same time,it will guide the design of other building up stations.
出处
《华东交通大学学报》
2006年第4期9-12,共4页
Journal of East China Jiaotong University