摘要
对南昌市前湖电排站3个设计方案分别从设备费用、机组安装调试、土建投资、年运行费、施工基坑排水难易等方面综合分析比较,选择最优方案.
Based on the comprehensive analysis and comparison,we selected a optimum scheme from 3 design schemes from the equipment cost,the fixing and debuging of the unit,the investment of civil engineering and the drainage of foundation ditch of construction.
出处
《江西水利科技》
2004年第B05期64-66,共3页
Jiangxi Hydraulic Science & Technology
关键词
南昌市
电排站
安装
基坑排水
泵站
Power drainage and irrigation station
Project layout
Design scheme