摘要
混凝土冬季施工质量较难控制 ,容易出现冻害 ,本例采取的暖棚法火炉加温的养护措施冬季施工方案 ,利用滑移模架两侧的护栏搭设暖棚 ,简单有效 。
The quality of concrete construction is difficult to control in winter due to frozen damage. In the paper, a new plan is proposed, which is the warm shack with fire stove is adopted in winter construction. By utilizing the fences in the two sides of slippage mould frame to set up the warm shack, the plan is easy, efficient and applicable.
出处
《森林工程》
北大核心
2004年第5期55-56,共2页
Forest Engineering
关键词
滑移模架
连续箱梁
冬季施工
方案
slippage mould frame
continuous box_girder
winter construction
plan