摘要
本文阐述了作者在吸收理解国内外设计经验的基础上,结合浙江嵊县发电厂的实际工艺过程,自行研究设计的75t/h循环统化床锅炉热工自动控制系统.该系统已在嵊县发电厂正式投运.
The paper describes the already commissioned thermal control system for the 75 t/h CFB boiler of Shenxian Power Plant, Zhejiang Province, self-developed by the Design & Research Institute, Northeast-China College of Electric Power on the basis of assimilated and comprehended experiences at home and abroad, as well as the practical technological process of this plant. This system has been placed in normal operation.
出处
《动力工程》
CSCD
1993年第4期48-52,共5页
Power Engineering