期刊文献+

梯级水电站AGC的实现方法研究 被引量:5

Study on Realization Method of AGC (Automatic Generation Control) in Cascade Hydropower Station
在线阅读 下载PDF
导出
摘要 提出了针对常见的厂内AGC和厂间AGC模型的两种算法。其中 ,厂内AGC的算法中提出了新的机组启停原则 ;厂间AGC的算法中对求电站下游水位进行了可行的简化处理。将此模型和算法运用于清江梯级水电站并进行了仿真计算 ,取得了令人满意的结果。 Two new algorithms of conventional automatic generation control (AGC) models of in-the-plants and between-the-plants are presented in this paper, among which, the in-the-plant AGC algorithm is used to determine the principles of unit turning-on and turning-off, and the between-the plants AGC algorithm is used to feasibly simplify the calculation of the downstream water level of the power station. The models and algorithms are used in the Qingjiang Cascade Hydropower Station emulation calculation, and satisfactory results are achieved.
作者 程淑 李承军
出处 《中国农村水利水电》 北大核心 2004年第9期106-108,共3页 China Rural Water and Hydropower
关键词 梯级水电站 AGC 开(停)机评价 旋转方向法 cascade hydropower station AGC unit turning-on and turning-off evaluation revolving orientation method
  • 相关文献

参考文献3

二级参考文献5

共引文献42

同被引文献39

引证文献5

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部