摘要
简要阐述了西气东输工程钢管生产质量控制的重要性、选材及钢管技术条件确定、质量控制方案、质量控制模式,着重介绍了全过程质量控制和全过程驻厂监督的思路和方法。
A brief discussion is made of the importance of quality control, establishment of technical specifications for material selection and quality control for the manufacture of steel pipe used for the West-East Gas Pipeline Project. Focus is on the introduction of the approaches and methods of process quality control and process mill supervision.
出处
《石油工业技术监督》
2004年第11期15-19,共5页
Technology Supervision in Petroleum Industry