摘要
祁东县归阳镇白河大桥原设计为满堂支架整体浇筑的空心板梁,因工期紧迫必须在汛期施工,:原施工方案已不适应。通过修改设计把整体浇筑空心板变为逐跨浇筑空心板,改满常支架为梁式支架等措施,使该桥空心板梁在汛期顺利现浇成功。
The Baihe Bridge in Guiyang Town Qidong county was designed as a single-casting cored slabbeam constructed with full supports. The original construction scheme didn't fit the urgent schedule. It must be changed so that the construction must be undertaken in flood season. The author changed the original cored slab beam of integrity with full supports to continuous cored slab beam with beam supports. And the bridge was cast-in-place successfully in flood season.
出处
《筑路机械与施工机械化》
北大核心
2005年第2期40-41,54,共3页
Road Machinery & Construction Mechanization
关键词
连续空心板
汛期
现浇
continuous cored slab beam
flood season
cast-in-place