超长预应力混凝土框架梁的布索方案 被引量:1

Tendon Disposition Options in Extra-Long Post-Tensioned Concrete Frame Beams
在线阅读 下载PDF
导出
摘要 确定预应力筋布索方案是超长预应力混凝土结构设计的一项关键内容。结合若干工程成功经验.就满足规范构造要求、减少摩擦损失、预应力筋有效连接、张拉锚固节点处理和无粘结预应力筋的应用等问题进行讨论并提出相关的建议,可为设计及施工提供参考。 The tendon disposition option is an important part in the design of extra-long post-tensioned concrete frames. Combining the successful experiences in some projects, some problems are discussed, such as the requirements of codes, methods for reducing the prestressed losses due to friction, effective connections of tendons, detail design of anchorage-seating joints and the use of unbonded post-tensioned tendons, etc. . Mean while some recommendations are presented, which may be regarded as references for similar projects.
机构地区 同济大学
出处 《结构工程师》 2004年第6期6-10,共5页 Structural Engineers
关键词 布索 框架梁 超长 无粘结预应力筋 预应力混凝土结构 锚固节点 张拉 方案 施工 工程 post-tensioned concrete, extra-long frame, tendon disposition option
  • 相关文献

参考文献12

二级参考文献8

  • 1游宝坤 陈富银 等.UEA水泥沙浆与混凝土长期性能的研究.第二届全国混凝土膨胀剂学术交流会论文集[M].北京:中国建材工业出版社,1998..
  • 2韩重庆.大面积预应力混凝土梁板结构不设温度缝研究[M].东南大学,2001..
  • 3韩重庆,学位论文,2001年
  • 4过镇海,钢筋混凝土原理,1999年
  • 5王铁梦,工程结构裂缝控制,1997年
  • 6周履,收缩徐变,1994年
  • 7GB J10 89 混凝土结构设计规范
  • 8游宝坤,第二届全国混凝土膨胀剂学术交流会论文集,1998年

共引文献206

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部