500kV江门变电站监测远动一体化系统的建设

Construction of integrated monitoring and telecontrol system in 500 kV Jiangmen Substation
在线阅读 下载PDF
导出
摘要 随着南方电网的成立, 500 kV江门变电站面临着向采用不同规约的三个主站系统传输数据的问题。为此, 对站内原有的两套独立系统(计算机监测系统和远动系统)进行了改造, 将监测系统和远动系统合为一体,在监测系统中增加远传功能, 使该系统具有三个独立的远传输出口, 可设置不同的规约并分别对应不同的主站系统。实践证明: 500 kV江门变电站监测远动一体化系统的建设是成功的。 After the establishment of China Southern Power Grid,500 kV Jiangmen Substation is faced with the problem of transmitting data to three master stations using different protocols.As a result, the originally independent monitoring system and telecontrol system in the substation are combined.Teletransmission function is added to the monitoring system and three separate teletransmission outlets included,which allow diverse protocol setting and correspond to different master station systems.Application results prove that the construction of the said system is successful.
作者 黄国政
出处 《广东电力》 2005年第1期26-28,共3页 Guangdong Electric Power
关键词 变电站 监测系统 数据采集与监控系统 远动系统 规约 规约转换器 substation monitoring system supervisory control and data acquisition system telecontrol system protocol protocol convertor
  • 相关文献

参考文献5

  • 1DL 5003-1991.电力系统调度自动化设计技术规程[S].[S].,..
  • 2DL 476-1992.电力系统实时数据通信应用层协议[S].[S].,..
  • 3GB/T 13729-2002.远动终端通用技术条件[S].[S].,..
  • 4DL 451-1991.循环式远动规约[S].[S].,..
  • 5IEC 60870-5-101.遥控设备及系统第5-101部分:传输规约基本遥控[S].[S].,..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部