期刊文献+

绥中36-1油田转注方案的数值模拟研究及实施效果分析 被引量:9

A numerical simulation of water injection plan and its effect analysis in SZ36-1 oilfield
在线阅读 下载PDF
导出
摘要 地层压力下降过快是绥中361油田Ⅱ期开发中所面临的主要问题。为了准确把握设计注水井在何时转注才能尽快恢复地层压力,在建立精细地质模型的基础上对该油田转注方案进行了数值模拟研究。通过比较不同转注方案的模拟结果和对部分井转注效果的分析,建议该油田目前未转注的设计注水井尽早全面实施转注。 A rapid drop of formation pressure is the main problem during StageⅡdevelopment of SZ^361 oilfield. To accurately identify the time when the designed injectors are injected in order to resume formation pressure as soon as possible, a numerical simulation has been conducted for the field water-injection plan on a basis of the refined geologic model. According to comparisons among simulation results from different injection plans and an injection effect analysis for some injectors, it is proposed that other injectors should be injected as soon as possible in SZ36-1 oilfield.
出处 《中国海上油气(工程)》 2005年第2期105-107,共3页 China Offshore Oil and Gas
关键词 绥中36-1油田 数值模拟研究 效果分析 方案 压力下降 地层压力 地质模型 模拟结果 注水井 设计 injection plan numerical simulation practical effect SZ36-1 oilfield
  • 相关文献

参考文献1

二级参考文献2

共引文献5

同被引文献64

引证文献9

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部