期刊文献+

饱和土地基中桩周土固结模式的分析及其级数解 被引量:5

Analysis on Consolidation Mode in Saturated Clayed Soil Foundation around Pile and Its Solution by Progression
原文传递
导出
摘要 该文对沉桩后桩周土的固结模式进行了讨论。在考虑了沉桩引起的超孔隙水压力的初始分布和边界条件后,通过MATLAB对该固结模式进行了级数求解,分析了各种参数变化对超孔压消散的影响。 The consolidation mode in saturated soil around setting pile is studied.Considered the initial distribution and boundary condition of excess pore water pressure caused by setting pile,the progression solution can be found by using MATLAB.The influence of various parameter variety to the dissipation of excess pore water pressure is analyzed,too.
作者 唐世栋 李阳
出处 《勘察科学技术》 2005年第3期3-6,25,共5页 Site Investigation Science and Technology
关键词 桩周土 饱和土地基 模式 固结 级数解 超孔隙水压力 MATLAB 边界条件 初始分布 孔压消散 参数变化 沉桩 pile consolidation excess pore water pressure solution by progression
  • 相关文献

参考文献5

  • 1Soderberg L,Consolidation theory applied to foundation pile time effects.Ge otechique,1962,12
  • 2Roy M,et al.Development of pore pressures in quasi-static penetration test in sensitive clay.Canadian Geotechnical Journal,1982,19(2):124~138
  • 3李雄,刘金砺.饱和软土中预制桩承载力时效的研究[J].岩土工程学报,1992,14(4):9-16. 被引量:70
  • 4钱家欢 殷宗泽.土工原理与计算[M].南京:河海大学出版社,1995..
  • 5Vesic A S. Expansion of cavities in infinite soil mass.Journal of the soil mechanics and foundation division, American society of civil engineers, 1972,98(3):265~290

二级参考文献5

  • 1孙更生,软粘土堪与地下工程,1984年
  • 2郑大同,地基极限承载力的计算,1979年
  • 3团体著者,1978年
  • 4胡中雄,1987年
  • 5胡中雄,岩土工程学报,1985年,7卷,3期,58页

共引文献94

同被引文献34

  • 1王新东.郑西铁路客运专线湿陷性黄土隧道基底处理技术[J].铁道标准设计,2007,27(z1):90-92. 被引量:6
  • 2宰金珉,王伟,王旭东,戚科骏,张云军.静压桩引起的超孔隙水压力及单桩极限承载力预测[J].工业建筑,2004,34(8):33-35. 被引量:24
  • 3李保雄,牛永红,苗天德.兰州马兰黄土的物理力学特性[J].岩土力学,2007,28(6):1077-1082. 被引量:45
  • 4Randolph M F, Carter J P, Wroth C P. Driven Piles in Clay: The Effects of Installation and Subsequent Consolidation [ J ]. Geotechnique, 1979, 29 (4) :361 - 393.
  • 5Pestana J M, Hunt Christopher E, Bray Jonathan D. Soil Deformation and Excess Pore Pressure Field Around a ClosedEnded Pile [ J ]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE ,2002,125 ( 1 ) : 1 - 12.
  • 6Chow F C, Jardine R J, Brucy F, et al. Effects of Time on Capacity of Pipe Piles in Dense Marine Sand[J]. Journal of Geoteehnical and Geoenvironmental Engineering, ASCE, 1998, 124 (3) : 254 - 264.
  • 7Randolph M F, Wroth C P. An Analytical Solution for the Consolidation Around a Driven Pile [ J ]. International Journal Numberic and Analytical Methods in Geomechanics, 1978, 3: 217 - 229.
  • 8章根德.钢管桩固结过程的分析.力学与实践,1987,9(4):18-22.
  • 9Wei Dong Guo. Visco-Elastic Consolidation Subsequent to Pile Installation[ J ]. Computers and Geotechnics, 2000, 26 : 113 - 144.
  • 10Branko Ladanyi, Hugo Longtin. Short-And Long-Term Sharp Cone Tests in Clay[J]. Canadian Geotechnical Journal, 2005, 42:136-146.

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部