期刊文献+

Experimental Study on Shear Lag Effect of Partial Cable-Stayed Bridge and Elasto-Plastic Seismic Analysis

Experimental Study on Shear Lag Effect of Partial Cable-Stayed Bridge and Elasto-Plastic Seismic Analysis
在线阅读 下载PDF
导出
摘要 The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organic glass scaled model was adopted to have an experiment and a theory research at one time. The experiment result is the basically same as the theory calculation which proves the FEA method can well calculate shear lag effect and dynamical performance. As a result, because the bridge is located in a seismic area of 8 degree, an elasto-plastic seismic checking is performed by customized FEA program in this paper. The project of Xiaoxihu Yellow River Bridge in Lanzhou is chosen as partial cable-stayed bridge. To get the shear lag effect and anti-earthquake performance of the actual bridge under various loading conditions, organic glass scaled model was adopted to have an experiment and a theory research at one time. The experiment result is the basically same as the theory calculation which proves the FEA method can well calculate shear lag effect and dynamical performance. As a result, because the bridge is located in a seismic area of 8 degree, an elasto-plastic seismic checking is performed by customized FEA program in this paper.
出处 《Journal of Shanghai Jiaotong university(Science)》 EI 2005年第2期170-174,共5页 上海交通大学学报(英文版)
关键词 partial cable-stayed bridge EXPERIMENT shear lag effect elasto-plastic seismic analysis 斜拉桥 剪切延滞 局部振动 实验研究
  • 相关文献

参考文献5

  • 1Singh Y,Nagpal A K.Negative shear lag in framedyube buildings[].Journal of Structural Engineering ASCE.1994
  • 2Reissner E.Analysis of shear lag in box beams by the principle of minimum potential energy[].Quarterly of Applied Mathematics.1946
  • 3Kuzmanovic B O,Graham J.Shear lag in box girders[].J ournal of the Structural Divison Proceedings of ASCE.1981
  • 4Chang S T.Prestress influence on shear lag effect in a continuous box girder bridge[].Journal of Structural Engineering ASCE.1992
  • 5Yim C-S,Chopra A K.Earthquake response of structures with partial uplift on Winkler foundation[].Earthquake Engineering and Structural Dynamics.1984

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部