摘要
介绍了万全串补站人工接地试验的实际情况,分析了串补装置在人工接地试验期间的动作行为,并根据对万顺线串补装置在系统调试试验期间不平衡保护动作原因的分析,提出了解决不平衡保护误动的措施。
This paper presents the performance of fault test on series compensation equipment in Wanquan substation during field verification tests, and based on the analysis the cause of capacitor unbalance protection action,the method of solving this problem is proposed.
出处
《华北电力技术》
CAS
2005年第8期1-3,共3页
North China Electric Power
关键词
串补
人工接地
不平衡保护
series compensation dault test
unbalance protection