摘要
通过对塌岸现状调查并进行监测研究,分析塌岸的影响因素,并对塌岸的规模进行预测。
Through the investigation of the existing Situation of the collapsed bank, factors impairing the bank are analysez also the collapse scale is forcasted.
出处
《土工基础》
2005年第4期27-29,共3页
Soil Engineering and Foundation
关键词
库岸再造
影响因素
规模预测
reservoir bank reconstrution, effecting factor, scale forcast