摘要
利用试井资料、啄油PVT资料等,对异常高压、特低渗透油藏储层渗透率伤害、产能变化规律等方面进行了研究,最终给出了油井合理工作制度的确定方法,确定了油井的合理产能,为油田开发方案设计及采油工艺设计提供了依据。
Utilizing the test well records and the information of PVT of oil etc, thoroughly studying the damage of formation permeable rate to abnormal high pressure, and super low permeability reservoir and their changing law of production, finally it is provided the method of well reasonable work system, established the reasonable well production rate and provided the proof of reservoir development project and oil recovery projection.
出处
《油气井测试》
2005年第4期10-13,共4页
Well Testing