期刊文献+

三峡电站进水口平面快速事故闸门水力特性试验研究 被引量:11

Research on hydraulic characteristics for intake emergency gate of Three Gorges Hydropower Station
在线阅读 下载PDF
导出
摘要 通过水工模型试验方法,研究了三峡电站进水口平面快速事故闸门关闭过程中的水力特性及闸门持住力等有关问题。分析了模型试验的相似性问题,然后对影响闸门持住力的几个要素分别进行了分析和验证,从而获得了能降低闸门持住力的几种可行性措施,并给出了确定启闭机容量的有关参数。 Based on hydraulic model test, the hydraulic characteristics of the quick-acting emergency plain gate for the power station of Three Gorge Project during its action and the holding force of the gate are studied herein, in which the comparability the model test is analyzed, and then the main factors effected on the holding force of the gate are analyzed and verified respectively. From the study, some available measures for lowering the holding force of the gate are obtained and the related parameters for determining the capacity of the gate lifter are put forward as well,
机构地区 长江科学院
出处 《水利水电技术》 CSCD 北大核心 2005年第10期17-19,26,共4页 Water Resources and Hydropower Engineering
关键词 快速闸门 临界开度 通气管 上托力 持住力 quick-acting gate critical opening vent pipe uplift holding force
  • 相关文献

参考文献1

  • 1谢省宗.快速闸门动水下降某些水力学问题的分析[A]..中国水利水电科学院科学研究论文集[C].北京:中国水利电力出版社,1983.1-13.

同被引文献82

引证文献11

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部