摘要 对湖南500 kV复沙Ⅰ线倒塔段应用大型通用有限元程序AN SYS建立单元模型,计算出铁塔随导线覆冰厚度变化的极限承载力,分析了该事故段铁塔倒塌的原因。根据计算结果,对铁塔的2种局部加强方案进行核算,并提出改造建议。 The tower falling down in Hunan 500kV Fusha line Ⅰ is modeled by large universal finite element software ANSYS, the ultimate loadcarrylng capacity of tower is calculated as the variation of the thickness of line ice accretion, and the cause of the tower falling down is analyzed. According to calculation result, two partial strengthen projects are calculated and checked, and countermeasures are suggested,
出处 《湖南电力》 2005年第5期1-3,11,共4页 Hunan Electric Power
关键词 输电线路 输电铁塔 有限单元分析 极限承载力 power transmission line+ transmission tower finite element anaLysis ultimate load-carrying capacity
  • 相关文献

参考文献2

  • 1湖南省电力勘测设计院.湖南省500kV线路冰害情况调查报告[R].,2005..
  • 2王国强.实用工程数值模拟技术及其在ANSYS上的实践[M].西安:西北工业大学出版社,2000.77-185.