期刊文献+

层状地层中自升式钻井平台桩脚稳定性分析 被引量:15

Footing Stability of Jack-up Rig in the Layered Soil
在线阅读 下载PDF
导出
摘要 影响自升式钻井平台桩脚在层状地层中的稳定性主要是穿刺.穿刺主要发生于上部为硬土层但下部为软弱层的层状地层体系中.文章重点介绍了用于穿刺分析的两种方法,推导了计算公式,并在实例中作了应用,得到了较为一致的结果.实例中两种计算方法得到的桩脚稳定性系数为0.3~0.5,插桩深度约7.1m,与实际插桩深度较为吻合.考虑了下卧软弱层影响下的上覆硬土层的承载力计算方法既可判断穿刺可能性又能得到插桩深度,是一种简便易行的方法.同时对影响桩脚在地层中稳定性的冲刷作用和动荷载作了提示,以便在进行平台桩脚的稳定性评价时予以综合分析. Punch-through is the main factor that affects the footing stability of jack-up rig in the layered soil. Geological condition that can cause a footing to experience a punch-through failure includes sand or strong clayey soil layer of limited thickness overlying a weaker clayey soil layer. The paper introduces two methods to obtain the possibility of punch-through failure and deduces the equation of calculation. The two methods are applied in one case that shows the result is consistent. In this case, the factor of stability based on different calculation method varies from 0.3 to 0.5 and the footing penetration is about 7. 1m, which approaches the actual penetration. It is recommended to calculate the ultimate bearing capacity of a strong stratum overlying a weaker clayey layer in order to evaluate the possibility of punch-through failure and footing penetration. Other factors affecting the footing stability such as scour and dynamic load are also discussed.
出处 《海洋石油》 CAS 2005年第4期91-95,共5页 Offshore Oil
关键词 自升式钻井平台 层状地层 穿刺 极限承载力 稳定性 Jack-up rig layered soil punch-through, ultimate bearing capacity stability
  • 相关文献

参考文献5

二级参考文献10

  • 1吴德盛 薛强.海洋钻井和采油工艺[M].石油工业出版社,1983..
  • 2Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms-Load and Resistance Factor Design, 1993. c4.
  • 3IMCO. 1989, Code for the construction and Equipment of Mobile Offshore Drilling Units, 2.5.5.
  • 4Marine Drilling Rigs 2002/2003[J]. Word Oil, 2002,12-69.
  • 5Bradbury J. Aker adds to maritime stalwart[J]. Hart's E&P,2002,75(2).
  • 6Field D. Using jackup, semi-submersible drilling units to install production structures[J]. Offshore. 2001,61 (1).
  • 7Makwoud J. Upgrades prepare fleet for deep drilling in deepwater[J]. Offshore. 2002,62(7): 46.
  • 8Harding B W. More upgraded deepwater rigs on the horizon[J]. Offshore, 2002,62 (7) : 44.
  • 9中国船级社.海上移动平台入级与建造规范[S].人民交通出版社,1992..
  • 10中国船级社.海上固定平台入级与建造规范[S].人民交通出版社,1992..

共引文献29

同被引文献119

引证文献15

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部