摘要
就大型地下暗挖车站的施工方案进行了研究探讨,主要对比了中洞法、侧洞法、中柱法各自不同的优缺点,根据东单站的具体情况,最终确定了中柱法作为实施方案。并对中柱法这一新型的施工开挖方法进行了介绍,为以后类似工程提供借鉴。
In this article, different construction schemes of large-scale underground mined Metro stations are studied. The advantages and disadvantages of central drift method, side drift method and central column method are compared. On basis of the actual conditions of Dongdan station, central column method is selected as the final construction method. The new excavation method, i.e. the central column method, is also described in the article, which can provide reference for future similar works.
出处
《隧道建设》
2006年第1期44-48,共5页
Tunnel Construction
关键词
地铁暗挖车站
施工方案
中柱法
mined Metro station
construction scheme
central column