联合循环电厂主蒸汽管道稳压吹管方法 被引量:7

Stable-pressure Steam Blowing-out Method for a Combined Cycle Power Plant
在线阅读 下载PDF
导出
摘要 介绍了电厂安装调试阶段中吹管的目的、吹管的原理和吹管合格的判定条件,简明介绍了电厂中常用的降压吹管方法和稳压吹管的方法;集中讨论了联合循环电厂及稳压吹管的特点,指出联合循环电厂中更适宜采用稳压吹管方法,同时给出了稳压吹管在实际工程中的应用实例。 The aim, principle and acceptance criteria of steam blowing-out during the erection and commissioning test stage of a power plant are described along with a brief account of the commonly used pressure-reduction and stable-pressure blowing-out method. A detailed discussion is conducted of the specific features of a combined cycle power plant and the stable-pressure steam blowing-out. It is noted that the stable-pressure blowing-out method is more suitable for use in a combined cycle power plant. Meanwhile, some specific cases of employing stable-pressure blowing-out method in power plant engineering are presented.
出处 《热能动力工程》 EI CAS CSCD 北大核心 2005年第2期201-202,207,共3页 Journal of Engineering for Thermal Energy and Power
关键词 联合循环 余热锅炉 吹管 稳压吹管 steam blowing-out, stable-pressure steam blowing-out, combined cycle power plant, heat recovery steam generator
  • 相关文献

同被引文献37

引证文献7

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部