摘要
结合白乃庙铜矿实际问题,介绍了有限元与可靠度分析相结合分析矿柱稳定性的方法,井对白乃庙铜矿“天窗”下矿柱的稳定性进行了可靠性分析,实践证明其分析所得结论是正确的。
In this paper ,the analysis method of the pillar sta-bility by combing Reliability Analysis Theory with FEM wasgived out and applied to the pillar stability under the‘skyligt’in Bainaimiao COpper Mine.The conclusion gainedfrom analysis calculation have been proved to be correctthrough the practice.
出处
《西部探矿工程》
CAS
1996年第1期33-35,39,共4页
West-China Exploration Engineering
关键词
稳定性
可靠性
矿柱
铜矿
采矿
stability reliability pillar copper mine