摘要
北京地铁5号线崇文门车站(大跨暗挖车站)下穿既有运营地铁隧道的施工在国内属首次。通过多次论证、试验探索及工程实践,车站终于在满足既有线结构和运营安全的条件下顺利完成。
The construction of Chongwenmen station (large-span cut-and coverstation) for Beijing subway line 5 through the tunnel of existing sub-way in operation is domestically a premiere in China. With the re-peated proofing, tests and exploration as well as the engineeringpractices, the station has been completed smoothly in the conditionthat requirements for structure and the operation safety of the existinglines are met.
出处
《现代城市轨道交通》
2006年第3期38-40,44,共4页
Modern Urban Transit