摘要
针对邢台国泰发电有限责任公司300 MW机组锅炉调试过程中发现的问题进行深入的分析和探讨,并给出具体的解决措施,确保了机组运行的安全性和经济性。
Through thoroughly analysis and discussions on the problems discovered in view of 300 MW boiler debugging process of Xingtai Guotai power plant Co. Ltd. , the effective solutions are shown to guaranteed the boiler security and the efficiency.
出处
《河北电力技术》
2006年第3期22-23,26,共3页
Hebei Electric Power
关键词
锅炉
吹管
燃烧器
boiler
blowpipe
burner