在协同项目中,伙伴企业间的任务分配问题直接影响到项目的整体获益。针对这一问题,以费用最小和承担企业数最少为目标,并充分考虑了任务之间的紧密关联关系,提出了一个有效的任务分配启发式算法,并进行了实例验证,给出了对算法的评价。
In collaborative project, the problem of task assignment among partners directly effects on gaining profit from the project. To solve the problem, a new heuristic algorithm is proposed, which objectives are minimmn cost and minimmn number of partners selected. The close connection between the tasks is also considered in it. Finally, the algorithm is verified through an example, and the evaluation for it is given.