期刊文献+

复合地层中盾构滚刀磨损原因分析及对策 被引量:82

Analysis of the abrasion of disc cutters of shields in composite ground and countermeasures
在线阅读 下载PDF
导出
摘要 通过系统地总结和分析约40台次混合式盾构机在复合地层中掘进近100 km的滚刀磨损情况,对滚刀磨损做了定性分类,并根据滚刀磨损的影响因素,提出滚刀磨损的对策,以期指导今后复合地层施工中盾构机刀盘刀具选择、配置及盾构掘进。 On the basis of boring about 100 Km tunnels with about 40 mix - shield drives in composite ground, this paper summarizes and analyzes the abrasion of disc cutters, postulates the qualitative classification of abrasion and puts forward the countermeasures to the abrasion according to the factors affecting it, in the hope of giving a guide to choose and install the disc cutters and cutter heads as well as to control the shield driving under this kind of ground condition.
出处 《现代隧道技术》 EI 北大核心 2006年第4期72-76,82,共6页 Modern Tunnelling Technology
关键词 复合地层 盾构 滚刀磨损 原因分析 对策 Composite ground Shield driving Abrasion of disc cutters Reason analysis Countermeasures
  • 相关文献

参考文献1

二级参考文献5

  • 1[英]帕克A 塞尔伍德BW.沉积物的成岩作用[M].中国地质大学出版社,1989..
  • 2Maidl Dr-Ing Ulrich, Sager Dipl-Ing Hans Joachim. Sticking points. Tunnels & Tunnelling International. 2001,33(1):28-31.
  • 3Zhu Weibin, Ju Shijian, Xie Baofeng, Luo Weixiong. On the engineering and countermeasures of crossing the Pearl River with two used shield machines in Guangzhou metro Line 2. New Devopment in Rock Mechanics & Rock Engineering. N J, USA: Rinton Press, 2002 : 389 - 394.
  • 4Maidi B., Herrenknecht M., Anheuser L.. Mechanised Shield Tunnelling. Ernst & Sohn, 1995.
  • 5Jancsecz, Krause, Langmaack. Advances of soil conditioning in shield tunnelling. 1999.

共引文献57

同被引文献578

引证文献82

二级引证文献694

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部