根据实际工程的水工模型试验资料,分析枢纽工程运行期的闸门调度、机组组合运行和导航墙长度对口门区通航水流的影响,提出改善通航水流条件的枢纽运行方式。
Based on the test result of hydraulic model of a project, paper analyzes the influences of gate operation during operating period, combined operation of hydro-generation sets and the length of guide wall on navigable flow condition in entrance area, and proposes the operation mode of the hydro-junction for improving navigation flow condition.