分析了220 kV组合电器(PASS)设备具有占地面积小,安装、维护方便等优点,通过清除220 kV变电站施工过程,介绍了PASS设备安装的一般流程。
220 kV PASS equipment has the area to be small, merit and so on installment, maintenance convenience, has the broad application prospect. This article through Qingxu 220 kV transformer substation construction process, introduced the PASS equipment setup general flow.