摘要
从整体性能优化的角度,分析110 MW机组冷端系统主要设备——凝汽器和给水泵的运行性能和存在的问题,以及对机组和冷端系统整体性能的影响,通过设备改造和运行方式优化,改善了冷端系统整体运行性能,提高了110 MW机组运行经济性。
In terms of the point of view of whole performance optimization, the operational performance and problems of main instrument condenser and circulating pump in 110MW turbine unit cold end system have been analyzed. And the effect on whole performance of turbine unit and cold end system resulting from condenser and circulating pump also has been analyzed. Through equipment retrofit and optimization of operational mode, the whole operational performance of cold end system has been optimized to improve the property of 110MW turbine unit.
出处
《电站系统工程》
北大核心
2006年第6期45-47,共3页
Power System Engineering
关键词
汽轮机组
冷端系统
冷端损失
试验研究
整体性能优化
turbine unit
cold end system
cold end loss
test research
whole performance optimization