地铁联络通道冻结加固技术研究 被引量:43

Study on Artificial Ground Freezing Method Applied to Connected Aisle Construction in Metro Tunnel
在线阅读 下载PDF
导出
摘要 结合上海地铁联络通道的冻结施工,介绍了联络通道和泵站合并建设模式下的冻土帷幕结构设计与水平冻结工艺,以及控制冻胀融沉的措施-强制解冻融沉注浆。对土体温度和地表变形等相关信息进行了监测,并对实测结果进行了分析。为今后联络通道冻结法施工提供了一定的参考。 Taking frozen construction of a thoroughfare of Shanghai Metro into account, the paper introduces the design of frozen soil structure and level freezing technology in the connected aisle project where this aisle and the pumping station are built together, and the measure of controlling frost heaving and thaw collapse by forced-thawing and grouting. The soil temperatures and ground surface deformation and associated information were monitored during the construction and the results measured were analyzed. The conculusion can be referred by future freezing method for construction of side channels.
出处 《地下空间与工程学报》 CSCD 2006年第B08期1341-1345,共5页 Chinese Journal of Underground Space and Engineering
关键词 地铁 联络通道 冻结加固 融沉注浆 metro connected aisle artificial ground freezing reinforcement thaw settlement grouting
  • 相关文献

参考文献3

二级参考文献4

  • 1-.地层冻结工程技术和应用:中国地层冻结工程40周年论文集[M].北京:煤炭工业出版社,1995..
  • 2陈湘生 杨春来.北京和上海地铁水平冻结法施工技术[J].岩石力学与工程学报,1999,(8):978-981.
  • 3中国地层冻结工程40周年论文集,1995年
  • 4陶龙光,城市地下工程,1996年

共引文献147

同被引文献220

引证文献43

二级引证文献273

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部