摘要
介绍了悬索桥的主缆测量方法,混凝土加劲箱梁(以下简称加劲梁)架设后的线型调整。
Methods for survey of main cables, geometric adjustment of erected prestressed concrete stiffening box girder (hereinafter referred to as stiffening girder) and geometric control of deck of Shantou Bay Suspension Bridge are introduced.
出处
《桥梁建设》
EI
CSCD
北大核心
1996年第4期62-65,共4页
Bridge Construction