摘要
在净化空调系统调试中,风量平衡和静压差调整是最主要的两项工作。针对现场调试中发现的一些常见问题,分析其产生的原因、提出相应的解决办法,指出了系统设计、施工过程中应注意的事项。
Air volume balance and space pressurization commissioning are the two uppermost works in clean room air-conditioning system commissioning. The text summarizes several common problems found in site commissioning, analyzes their causes and solutions, points out the proceedings we should pay attention to in the system design and construction.
出处
《洁净与空调技术》
2006年第B12期43-45,48,共4页
Contamination Control & Air-Conditioning Technology
关键词
净化空调系统
调试
风量平衡
静压差
Clean room air-conditioning system Commissioning Air volume balance Space pressurization