2Ponnambalam S G,Aravindan P,Naidu G M.A comparative evaluation of assembly line balancing heuristics.The International Journal of Advanced Manufacturing Technology,1999,(15):577
4Vance P H.Branch-and-price algorithm for the one-dimensional cutting stock problem.Computational Optimization and Application,1998,(9):211
二级参考文献1
1S.G Ponnambalam,P.Aravindan and G.Mogileeswar Naidu.A Compara tive Evaluation of Assembly Line Balancing Heuristics.The International Journal of Advanced Manufacturing Technology.1999,15.577~ 586.
3LEE C, LEEM C S, HWANG I. PDM and ERP integration methodology using digital manufacturing to support global manufacturing [ J ]. The International Journal of Advanced Manufacturing Technology,2011,53 ( 1 - 4) : 399 - 409.
4ZHANG Qingying, YUE Weihong. Research on shipbuilding production logistics system combining MRP-Ⅱ with JIT [ J ]. Journal of Southeast University ( English Edition), 2007(123) :151 - 155.
5YUE W, WANG C, ZHANG Q. Research on the shipbuilding logistics system under modern shipbuilding. Computing, Communication, Control, and Management, 2008. CCCM' 08 [ C ]. [ S. 1. ] : ISECS International Colloquium on. IEEE, 2008 (3) :222 - 225.
6YUE W, WANG C, ZHANG Q. Study on the shipbuilding production management system under modem shipbuilding. Service Operations and Logistics, and Informatics ,2008 [ C ]. [ S. 1. ] :International Conference on. IEEE,2008( 1 ) :261 - 264.