某发电厂1号机组振动故障的诊断及消除 被引量:2

DIAGNOSIS AND ELIMINATION OF VIBRATION TROUBLES OCCURRED ON UNIT No. 1 IN ONE POWER PLANT
在线阅读 下载PDF
导出
摘要 某电厂1号引进型300 MW机组在试运时,3、4、6号轴承振动(瓦振动)过大。在完成168 h试运行后,利用小修消缺的机会,对机组振动原因进行诊断,认为振动是激振力过大所致。通过调整轴系平衡,使机组3 000 r/min和满负荷下各瓦轴振动、瓦振动达到了满意的水平。 An imported type 300 MW unit no. 1 in one power plant had excessive vibration (bearing shoe vibration) of bearing no. 3. no. 4, and no. 6 in trial operation of the newly installed unit. After completion of 168 h trial operation, taking the opportunity of temporary repair for eliminating defects, diagnosis of causes for vibration troubles of said unit has been carried out. Through adjustment of shaft balancing, the shaft vibration and bearing shoe vibration of each bearing shoe under 3000 r/min and full load have all reached a satisfactory level.
作者 刘细求
出处 《热力发电》 CAS 北大核心 2006年第12期34-36,共3页 Thermal Power Generation
关键词 300 MW机组 轴承振动 轴振动 轴系平衡 300 MW unit bearing vibration shaft vibration shaft balancing
  • 相关文献

参考文献1

  • 1施维新.汽轮发电机组振动及事故[M].北京:中国电力出版社,1998..

共引文献67

同被引文献1

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部