期刊文献+

500kV同塔四回线路工频过电压研究 被引量:13

Power frequency over-voltage of 500 kV four-circuit lines on the same power
原文传递
导出
摘要 国内500 kV同塔四回输电线路将是国际上首次应用。介绍了几种塔型结构、相序布置在不同系统运行方式下的线路工频过电压、潜供电流和恢复电压的研究情况,分析了塔型和相序变化对工频过电压和潜供电流的影响,并提出了结论和建议。 The 500 kV four-circuit lines on the same power to be built in China is the first one in the world. The power frequency over-voltage, the secondary arc current, and the recovery voltage of the lines with different tower types and various phase order arrangement are studied under different system operational modes. The influences of tower types and phase orders on the power frequency over-voltage and the secondary arc current axe analyzed, and conclusions and suggestions are proposed.
出处 《华东电力》 北大核心 2007年第3期24-27,共4页 East China Electric Power
关键词 超高压输电线路 同塔多回线路 工频过电压 潜供电流 恢复电压 extra high voltage transmission line multi-circuit lines on the same tower power frequency over-voltage secondary arc current recovery voltage
  • 相关文献

参考文献5

  • 1DL/T620-1997.交流电气装置的过电压保护和绝缘配合[S].[S].,..
  • 2GB311.1-1997.高压输变电设备的绝缘配合[S].[S].,..
  • 3GB/T 311.2-2002.绝缘配合第二部分:高压输变电设备的绝缘配合使用导则[S].
  • 4DOE/RA/2133-01,1980.6 Electrical and Mechanical Design Criteria for EHV and UHV Overhead Transmission Line[S].US Department of Energy.
  • 5DL/T615-1997.交流高压断路器参数选用导则[S].

共引文献363

同被引文献120

引证文献13

二级引证文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部