摘要
本文通过对砖砌烟囱爆破拆除的实例分析得到,在砖砌烟囱的爆破拆除倾倒过程中,其倾倒支点是不断移动的,随着烟囱主体的不断下沉,相对于未垮部分的烟囱主体来说,该支点沿烟囱筒体不断向上移动。这表明,不能简单地按刚体模型描述砖砌烟囱的倾倒运动。
In this paper, an analyzed result.obtained from observations of demolished brick-chemney in toppling process, shows that the fulcrum position of the toppling chemney is moving with time. With the descending of the brick-chemney, the fulcrum position is continueously moving up relative to the un-collapsed part of the chemney.lt demonstrates that the rigid model could not be used to describe the toppling process of a demolished brick-chemney.
出处
《爆炸与冲击》
EI
CAS
CSCD
北大核心
1989年第2期170-175,共6页
Explosion and Shock Waves
关键词
烟囱
爆破
拆除
倒塌过程
controlled blasting, chimney demolition, collapse process.