1Ekkehard Schulz, Dieter Ameling, et aL State of the art and development potential of the currently applied metallurgical production processes [J]. Metallurgical Plant and Technology International, 1990,5: 45--48.
7Gerhard Bocher, Uwe Hoffmann. Operational Experience witha Resonance Mould with Hydraulic Drive Used in Slab Casting[J]. MPT International,1995,(5):52-58.
8Takeuchi E, Brimacombe J K. The Formation of OscillationMarks in the Continuous Casting of Steel Slab [J]. Metallurgi-cal and Materials Transactions,1984,15B:493-509.
9Brendzy J L, Bakshi I A, Samarasekera I V, et al. Mould-Strand Interaction in Continuous Casting of Steel Billets Part 2Lubrication and Oscillation Mark Formation [J]. Ironmakingand Steelmaking,1993,20(1):63-74.
10Yang H L, Zhao L G. Mathematical Simulation on CoupledFlow, Heat and Solute Transport in Slab Continuous CastingProcess [J]. Metallurgical and Materials Transactions,1998,29B(6):1345-1356.