摘要
首先依据工程变更内容将工程变更划分为工作范围变更、施工条件变更、设计变更、施工变更和技术标准变更,对不同内容的变更区别情况提出不同控制方法。其次,依据工程变更性质将工程变更划分为重大变更、重要变更和一般变更,通过建立不同变更审批权限控制工程变更。最后依据工程变更的迫切性将工程变更划分为紧急情况下的变更和非紧急情况下的变更,通过设定不同变更处理程序进行控制。
Firstly, according to variation contents, the paper divides variation into operating range variation, construction condition variation, design variation, construction variation and technique standards variation. Contraposing to different content variation, the paper puts forward dissimilar control methods. According to the property of project variation, the paper divides variation into fatal variation, important variation and general variation, and points out that we can control variation effectively by establishing dissimilar authority of project variation examination and approval. Finally, according to the urgency of variation, the paper divides variation into variation under urgent circumstance and variation under not urgent circumstance, and puts forward that we can control these variation by different procedure.
出处
《建筑经济》
北大核心
2007年第7期82-84,共3页
Construction Economy
关键词
工程变更
分类控制
工程师
project variation
classification control
engineer