摘要
结合工程概况,对模型的建立和参数选择进行了分析,并对模拟的具体施工过程进行了介绍,同时对车站主体开挖引起的周围地表沉降和桥墩沉降值与施工监测数据进行了对比分析,为今后类似工程提供了参考。
Combined with project survey, it analyzes the model foundation and the parameter selection, introduces the concrete construction process of the model, and does contrast analysis between the surrounding ground subsidence and pier subsidence created by the main part excavation and construction monitoring data, which wilt supply reference to the similar projects.
出处
《山西建筑》
2007年第23期126-128,共3页
Shanxi Architecture
关键词
洞桩法
桥基
地表沉降
桥墩沉降
hole pile method, bridge foundation, ground subsidence, pier subsidence