期刊文献+

综合利用要求下的黄河上游梯级水电站日运行方式的探讨 被引量:4

Discussion on Daily Operation Mode of Upper Stream Cascade Hydropower Station of Yellow River under Requirements of Comprehensive Utilization
在线阅读 下载PDF
导出
摘要 介绍了黄河上游梯级水电站的运行情况,论述了黄河上游工农业用水、宁夏和内蒙河段的防凌要求以及、灌溉期间。灌墨取水等缔令利用的需求,分析了原有梯级水库的运行方式,提出了满足综合利用对水库下泄要求的黄河上游梯级水库短期运行的方式、方法。 The operation situation of upper stream cascade hydropower station in Yellow River is introduced. The demand of comprehensive utilization such as industrial and agriculture water use, ice prevention requirements on Ningxia and Inner Mongolia section and the irrigation water during the irrigation period are discussed. The formal operation mode of the cascade reservoir is analyzed and the short-term operation mode and method for the upper stream cascade reservoir in Yellow River meeting the requirements of comprehensive utilization is put forward.
作者 廖春梅 郑永恒 张云辉 LIAO Chun-mei, ZHENG Yong-heng, ZHANG Yun-hui (1.Gansu Electric Power Corporation, Lanzhou 730050, China; 2. Northwest China Grid Company, Xi'an 710048, China;3.IWHR,Beijing 100038, China)
出处 《电网与水力发电进展》 2007年第3期72-74,共3页
关键词 综合需求 梯级水库 调度 方式 comprehensive utilization cascade reservoir dispatch mode
  • 相关文献

参考文献2

二级参考文献4

共引文献8

同被引文献22

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部