期刊文献+

Grey Prediction Based Software Stage-Effort Estimation 被引量:3

Grey Prediction Based Software Stage-Effort Estimation
在线阅读 下载PDF
导出
摘要 The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential. The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential.
出处 《Wuhan University Journal of Natural Sciences》 CAS 2007年第5期927-931,共5页 武汉大学学报(自然科学英文版)
基金 Supported by the National Natural Science Foundation of China (60673124) the National High Technology Research and Development Program of China (863 Program)(2006AA01Z183).
关键词 project management software engineering sorftware effort estimation grey model project management software engineering sorftware effort estimation grey model
  • 相关文献

参考文献10

  • 1Shepperd M J.Evaluating Software Project Prediction Systems[].th IEEE International Software Metrics Symposium (METRICS ).2005
  • 2Song Qinbao,Shepperd M J,Carolyn M.Using Grey Relational Analysis to Predict Software Effort with Small Data Sets[].th IEEE International Software Metrics Symposium(METRICS ).2005
  • 3Wang Yifan.On-Demand Forecasting of Stock Prices Using a Real-Time Predictor[].IEEE Transactions on Knowledge and Data Engineering.2003
  • 4Shen D H,Du J C.Grey Model for Asphalt Pavement Performance Prediction[].IEEE Intelligent Transporta- tion systems Conference.2004
  • 5Luo R C,Chen T M,Su K L.Target Tracking Using a Hierarchical Grey-Fuzzy Motion Decision-Making Method[].IEEE Transactions on Systems Man and Cybernetics Part A.2001
  • 6MacDonell S G,Shepperd M J.Using Prior-Phase Effort Records for Reestimation During Software Projects[].th IEEE International Software Metrics Symposium (Metrics ).2003
  • 7Kulkarni A,Greenspan J B,Kriegman D A , et al.A Generic Technique for Developing a Software Sizing and Effort Estimation Model[].Proc COMPSAC‘.1988
  • 8Liu Sifeng,Dang Yaoguo,Fang Zhigeng.Grey System Theory and Application[]..2004
  • 9Deng Julong.Control Problems of Grey Systems[].Systems and Control Letters.1982
  • 10Huang Shiuh-Jer,Huang Chien-Lo.Control of an inverted pendulum using grey prediction model[].IEEE Transactions on Industry Applications.2000

同被引文献25

  • 1何晓阳,王亚沙.基于模型的软件成本估计方法[J].计算机研究与发展,2006,43(5):777-783. 被引量:10
  • 2李明树,何梅,杨达,舒风笛,王青.软件成本估算方法及应用[J].软件学报,2007,18(4):775-795. 被引量:66
  • 3[印]Pankaj Jalote著,施平安译.软件项目管理实践[M].北京:清华大学出版社,2003:1-3.
  • 4Nan--Hsing Chiua and Sun--Jen Huang. The adjusted analogy--based software effort estimation based on similarity distances [J]. Journal of Systems and Software, April 2007, 80(4): 628--640.
  • 5Zhangjunguang LvTingjie.Method Study of Software Project Monitoring and Control .中国管理科学,:127-132.
  • 6Sun -Jen Huanga. A comparative evaluation on the accuracies of software effort estimates from clustered data [J]. Information and Software Technology, 2008, 50 (9) :879--888.
  • 7Verner J M, Evanco W M, Cerpa N. State of the practice: an exploratory analysis of schedule estimation and software project success prediction[J]. Information and Software Technology, 2007, 49 (2) : 181-- 193.
  • 8Martin R. Evaluation of Current Software Costing Tools [J]. ACM Sigsoft Notes, 1988, 13(3): 49--51.
  • 9Herroelen, Roel Leus. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19:559--577.
  • 10Matson J, Barret B, Melliehamp J. Software Development Cost Estimation Using Funtion Points [J]. IEEE Transactions on Software Engineering, 1994, 20 (4): 275--287.

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部