期刊文献+

发电企业作业成本通用模型研究 被引量:12

General activity-based cost model for power generation enterprise
在线阅读 下载PDF
导出
摘要 以火力发电企业为例,围绕发电企业作业成本通用模型研究的主要环节,即资源库模型的建立、作业库模型设计、成本对象模型设计、成本动因模型设计等,分析发电企业自身特点对通用作业成本模型设计产生的影响,总结和归纳每一个环节的基本设计原则,并进一步提出了该环节具体的模型设计结构。考虑系统性和通用性原则,提出以企业资源规划(ERP)科目表为设计蓝本建立资源库;参考EUCG国际标准,以建立层次清晰的通用电力作业库;确定以发电设备系统及机组为核心的2层成本计算对象,用以归集设备和机组的相关成本。发电企业通过对作业成本法的合理运用,可以重点加强设备维修、维护的管理水平和成本核算的广度及深度。 With thermal power plant as an example,the influences of its features on the design of general activity- based cost model is analyzed in main steps,including the resource pool construction,activity pool design,cost- object model design,and dynamic cost- factor model design. The basic design principle and the detailed design model structure of each step are presented. According to the rules of systematization and generalization,the resource pool is constructed based on the ERP(Enterprise Resource Planning) item table. According to EUCG international standard,the general electric power activity pool is built with clear hierarchy. The generation equipment system and unit are taken as the fundamental objects of two- level cost calculation to classify equipment cost and unit cost. The proper application of activity- based cost method may promote the management of power plant equipment maintenance and expand the depth and width of cost accounting.
出处 《电力自动化设备》 EI CSCD 北大核心 2008年第1期47-51,共5页 Electric Power Automation Equipment
基金 国家自然科学基金项目(70671041)~~
关键词 作业成本法 成本作业管理 价值链 发电成本 activity- based cost method activity- based management value chain generation power cost
  • 相关文献

参考文献11

  • 1PU Qiangguo,XIA Haili,WU Zhengqin,et al. The application of the system parameter fusion principle to evaluating the core competence of the corporation [C ]//Proceedings of the 2003 IEEE International Conference on Information Reuse and Integration, 2003. Las Vegas,NV,USA:IEEE Systems,Man,and Cybernetics Society, 2003 : 160- 166.
  • 2PJERCE B. Activity based costing- true innovation or passing fad [J ]. Accountancy Ireland, 2004,36 (5) : 28 - 31.
  • 3KIANI R,SANGELADJI M. An empirical study about the use of the ABC/ABM models by some of the fortune 500 largest industrial corporations in the USA [J ]. The Journal of American Academy of Business, 2003,3( 1 ) : 174- 182.
  • 4董爱丽,李引花.作业成本法在我国应用的条件分析[J].科技情报开发与经济,2007,17(4):160-161. 被引量:1
  • 5吕宏新.成本会计的发展趋势及对策[J].科技情报开发与经济,2006,16(13):110-111. 被引量:17
  • 6COOPER R, KAPLAN R S. The design of cost management systems: text and cases [M ]. New Jersey: Prentice Hall, 1999.
  • 7INNES J,MITCHELL F. The application of activity - based costing in the United Kingdom's largest financial institutions [J]. The Service Industries Journal, 1997, 17( 1 ) : 190- 203.
  • 8陈亮,姚建刚,阳晓.火电厂企业管理的ERP模式分析[J].电力自动化设备,2003,23(2):34-36. 被引量:15
  • 9孙炜,林中达.基于工作流的电力企业管理[J].电力自动化设备,2002,22(3):26-28. 被引量:14
  • 10PATRICK J,OLDANI R,von BEHREN D. Profiling your plant engineering staff [J]. Power,2006,150(6) : 102-106.

二级参考文献9

  • 1Tamura R A.Lotus Notes和Domino Server4.6技术大全[M].北京:机械工业出版社,1998..
  • 2HIEBER R,AKARD R. New generation of information system for the extended enterprise[A].Globol Production Management [ C ]. Holand: Kluwer Academic Publishers,1999.
  • 3张后启.企业管理软件的发展历程[J].计算机世界,2001,(12):7-10.
  • 4王惠芬 左小德.我国企业MRPⅡ/ERP系统应用调查[J].计算机世界,2001,(12):14-17.
  • 5龚明 甘仞初.企业管理信息系统建设[J].计算机科学,1999,(10):59-61.
  • 6王广宇,丁华明.作业成本管理[M].北京:清华大学出版社,2005.
  • 7毛根生,毛波影,王丹亚.文档管理系统中的工作流技术[J].浙江大学学报(自然科学版),2000,34(1):60-64. 被引量:12
  • 8冯峰,王小刚.OAS中的工作流设计方法[J].计算机工程与应用,2000,36(3):91-93. 被引量:11
  • 9孙晓鲁.我国作业成本法的应用推行条件问题浅析[J].北方经贸,2003(2):114-115. 被引量:4

共引文献45

同被引文献42

引证文献12

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部