摘要
对国华盘电1号主变C相总烃超标的原因进行了分析,介绍了处理存在问题的对策,并对制造厂家提出了改进建议。
This paper analyzes the cause of total hydrocarbon overstandard of main transformer 1 at the phase C in Guohua Panshan Power Generation Co. Ltd. , introduces the countermeasures in order to solve the problems existed and proposes the improving suggestions for manufacturer.
出处
《华北电力技术》
CAS
2007年第A02期166-168,共3页
North China Electric Power
关键词
变压器
色谱试验
烃超标
transformer
chromatographic test
hydrocarbon overstandard