摘要
针对外高桥第二发电有限责任公司900 MW机组的循环水系统存在的安全、经济上的设计缺陷,通过分析,详述了循环水系统优化前后的改进措施,对已经采取的技术改进措施进行总结论证,提出了一些新的改进措施和想法。
To solve the design defects of the circulating water system of the 900 MW unit in Shanghai Waigaoqiao No. 2 Power Generation Co. , Ltd. , the optimization measures are proposed. The adopted improvement measures are summarized, and some new measures are put forward.
出处
《华东电力》
北大核心
2008年第2期21-24,共4页
East China Electric Power
关键词
循环水系统
循环泵
节能降耗
circulating water system
circulating pump
energy-saving and consumption-reducing