综放面特殊煤层的注水降尘研究 被引量:35

Dust Reduction by Water Injection into Coal Seam of Fully Mechanized Top-Coal Caving Face
在线阅读 下载PDF
导出
摘要 基于淮南矿区谢桥煤矿1151(3)综放面,煤层松软、渗透性低、湿润性差的特殊条件,采用煤层注水工艺技术降尘,在注水孔布置方式及参数、注水孔封孔工艺、注水工艺等方面采取一定的技术措施.分析实测结果表明,实施该套工艺技术后,煤层水分平均增量为2.84%,采煤机司机处全尘降尘效率为72.6%,采煤机下风10 m处全尘降尘效率为65.95%,回风巷全尘降尘效率为56.8%,取得了良好的降尘效果.通过现场研究,得出该套煤层注水降尘工艺技术确实可行,解决了特殊煤层的注水降尘技术难题. The coal seam of fully mechanized top-coal caving face 1151(3) in Xieqiao coal mine of Huainan mining area is soft and loose, and is of low permeability and poor wetting condition. Aiming at this situation, we adopted the technique of water injection into coal seam to reduce the dust. Certain measures were taken in the layout of water injection holes and in hole sealing. The in situ measurement indicates that the coal moisture is increased by 2.84%, dust reduction rate of the area around coal cutter driver is 72.6%, that at the place 10 m below the coal cutter is 65.95%, and that in air return roadway is 56.8%. So the technology of water injection for dust reduction is feasible and can well solve the difficult technological problem of reducing dust in some special coal seams.
出处 《采矿与安全工程学报》 EI 北大核心 2008年第1期99-103,共5页 Journal of Mining & Safety Engineering
基金 国家"十五"科技攻关项目(2001BA803B0414)
关键词 综放面 特殊煤层 注水 降尘技术 fully mechanized top-coal caving face special coal-seam water injection dust-falling technology
  • 相关文献

参考文献8

二级参考文献4

  • 1煤炭科学研究总院重庆分院 兖矿集团公司兴隆庄煤矿.综放工作面煤层注水技术的研究[M].重庆:煤炭科学研究院重庆分院,1999..
  • 2张延松 张顶立.综放工作面综合防尘技术与发展[J].中国安全科学学报,1998,(6).
  • 3[2]蒋月姣.综放面综合防尘现状及其发展[J].煤炭工程师,1997,22(2):35-37.JIANG Yue-jiao.Present condition and development of comprehensive dust prevention at fully mechanized caving faces[J].Journal of coal engeneering,1997,22(2):35-37.
  • 4贺喜,张仁贵,彭担任.煤层注水监测监控系统[J].煤矿机械,2003,24(8):80-81. 被引量:2

共引文献64

同被引文献256

引证文献35

二级引证文献139

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部