客运专线某钢管混凝土提篮拱桥列车走行性分析 被引量:3

Analysis of train running performance on a basket handle arch bridge of concrete-filled steel tube on passenger special line
在线阅读 下载PDF
导出
摘要 针对武广客运专线胡家湾大桥,提出单箱三室箱形系梁的钢管混凝土拱桥空间振动分析模型,建立了高速列车-桥梁系统振动方程。运用列车脱轨能量随机分析理论,计算了胡家湾大桥上列车走行安全性。提出桥梁抗脱轨安全系数的计算式,并计算了该桥的抗脱轨安全系数。在列车不会脱轨的条件下,计算了该桥上列车走行舒适性。计算结果表明:ICE列车以不超过300 km/h车速通过该桥时,列车不会脱轨;桥梁抗脱轨安全系数很大,具有很高的抗脱轨安全度;在列车正常运行时,舒适性指标达到了良好以上等级。研究成果可为该桥设计提供理论依据。 Aiming at Hujiawan bridge on Wuhan- Guangzhou passenger special line, the calculation model for basket handle arch bridge with box girder of a box and three rooms was presented, and the vibration equation of high - speed train - bridge system was established. Based on the theory of energy random analysis for train derailment, train running safety on Hujiawan bridge was calculated. The calculation formula of safety factor for bridge resisting derailment was put forward, and the safety factor for resisting derailment on the bridge was calculated. When train will not derail, the running comfort on the bridge was calculated. The calculated results show that ICE train will not derail on the bridge under the speed of 300 km/h, and the safety factor for resisting derailment is large relatively, and the degree for resisting derailment on the bridge is high, and the running comfort of train on the bridge is good. The analysis results may provide reference for design of the bridge.
出处 《铁道科学与工程学报》 CAS CSCD 北大核心 2008年第1期46-50,共5页 Journal of Railway Science and Engineering
基金 国家重点基础研究发展计划资助项目(2007CB714706) 国家自然科学基金资助项目(50678176) 铁道部科技研究开发计划项目(2004G028-B)
关键词 客运专线 钢管混凝土拱桥 脱轨 能量随机分析理论 passenger special line arch bridge of concrete - filled steel tube derailment theory of energy random analysis
  • 相关文献

参考文献8

  • 1铁建设[2004]157号,京沪高速铁路设计暂行规定[S].
  • 2TB10002.1-2005,铁路桥涵设计基本规范[S].
  • 3铁道部科学研究院,济南铁路局,徐州铁路分局.津浦线货物列车脱轨试验报告[R].北京:铁道部科学研究院,1997.
  • 4铁道部科学研究院,北京铁路局.大秦线C63A货物列车脱轨试验报告[R].1997.
  • 5Yang Y B, Wu Y S. A versatile element for analyzing vehicle -bridge interaction response [ J ]. Engineering Structure, 2001(5) :452 - 469.
  • 6Au F T K, Wang J J, Cheang Y K. Impact study of cablestayed bridge under railway traffic using various models [J]. Journal of Sound and Vibration,2001 (3) :447 - 465.
  • 7Song M K, Noh H C, Choi C K. A new three - dimensional finite element analysis model of high - speed train - bridge interactions [ J]. Engineering Structure, 2003 ( 13 ) : 1611 - 1626.
  • 8曾庆元,向俊,娄平,周智辉.列车脱轨的力学机理与防止脱轨理论[J].铁道科学与工程学报,2004,1(1):19-31. 被引量:34

二级参考文献16

  • 1向俊,曾庆元,娄平.Theory of random energy analysis for train derailment[J].Journal of Central South University of Technology,2003,10(2):134-139. 被引量:13
  • 2石田弘明 手冢和彦 等.脱轨稳定性评定指标的研究[J].铁道综研报告,1995,9(8):49-54.
  • 3XIANG Jun, ZENG Qing-yuan ,LOU Ping. Transverse vibration of train-bridge and train-track time-variant system and the theory of random energy analysis for train derailment[J]. Vehicle System Dynamics, 2004,41(2): 129-155.
  • 4Elkins J A, Carter A. Testing and analysis techniques for safety assessment of rail vehicles[J]. The State-of-the-Art,Vehicle System Dynamics,1993,22:185-208.
  • 5Weinstock H. Wheel climb derailment criteria for evaluation of rail vehicle safety[A]. Proceedings of the ASME Winter Annual Meeting[C]. 84 and WA/RT-1, 1984:1-7.
  • 6Sweet L M, Karmel A. Evaluation of time-duration dependent wheel load criteria for wheel climb derailment[J]. ASME Journal of Dynamic Systems, Measurement, and Control, 1981,103: 219-227.
  • 7Nadal M J. Theorie de stabilit'e des locomotives, part 2, mouvement de lacet[J]. Annales des Mines, 1896, 10:232.
  • 8Timoshenko ,Gere. Theory of Elastic Stability[M]. New York: McGraw-Hill Book Company,1961.83.
  • 9曾庆元.弹性系统动力分析的位移变分法[J].工程力学,2002,:119-134.
  • 10翟婉明.车辆-轨道耦合动力学[M].北京:中国铁道出版社,2002..

共引文献263

同被引文献25

引证文献3

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部