期刊文献+

结合影响矩阵的正装迭代法在优化施工索力中的应用 被引量:2

Construction Force Optimization Applying Forward-analysis Iterative Method Associating Influence Matrix
在线阅读 下载PDF
导出
摘要 在斜拉桥施工控制中,为了达到设计成桥状态目标,需要对施工索力进行计算和调整。以国内弯道半径最小的斜拉桥为例,引入影响矩阵,通过迭代消除不闭合问题,从而可使施工索力得到优化,达到预先设定的成桥内力和线形。实例证明,该方法在斜拉桥施工控制中具有较好的精度和分析效率,可减少计算过程中受过多不确定因素的影响,对于解决类似的问题有较大的参考价值。 In the construction monitoring and controlling of cable-stayed bridge, in order to achieve the finished state that predefined, we always adjust the cable force. This paper gives the example using cable-stayed bend bridge with minimum radius in China, offsetting unclosed state by influence matrix and iterative method. The method can achieve optimization of cable force and the finished internal force and line shape as predefined. As is proved, this method can reduce the influence of uncertaint factors in computation because it has high accuracy and efficiency in cable bridge construction controlling, and can provide reference for similar construction.
出处 《交通标准化》 2008年第4期61-63,共3页 Communications Standardization
关键词 斜拉桥 影响矩阵 正装迭代法 施工索力优化 cable-stayed bridge influence matrix forward-analysis iterative method optimizing cable force
  • 相关文献

参考文献4

二级参考文献15

共引文献290

同被引文献17

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部