期刊文献+

基于自组织映射神经网络的多目标调度研究 被引量:2

SOM-based approach for addressing multi-criteria scheduling problems
在线阅读 下载PDF
导出
摘要 为解决后验式场景下的多目标生产调度问题,提出一种基于自组织映射神经网络的策略来生成近似Pareto边界。该方法首先使用拉格朗日松弛法获得若干Pareto解,从而将搜索范围划分为若干区域。对于每一个区域,构造两个并发运行的自组织映射神经网络搜索区域中的Pareto解,在不增加求解时间的情况下提高了求解精度。另外,根据多目标调度问题的特点,改变了神经网络训练过程中邻域的定义,从而加快了求解速度。仿真实验验证了该算法的可行性与有效性。 To solve the posterior multi-criteria scheduling problems, a new method based on Self-Organization feature Map neural network (SOM) was presented to generate approximate Pareto boundaries. Firstly, Lagrange relaxation algorithm was applied to obtain several Pareto optima which were exploited to divide the search space into several domains. For each domain, two simultaneously running SOM were constructed to explore the remaining Pareto optima. According to the char- acteristics of multi-criteria scheduling, a new definition of neighbor for neural network training was proposed. Numerical experiments demonstrated the feasibility and the effectiveness of this algorithm.
作者 夏凌 谷寒雨
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第4期757-760,820,共5页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(60474002 60504026) 国家863计划资助项目(2006AA04Z173)~~
关键词 多目标调度 Pareto边界 自组织映射神经网络 拉格朗日松弛法 multi-criteria scheduling Pareto boundary self-organizing feature map neural network Lagrange relaxation algorithm
  • 相关文献

参考文献10

  • 1TKINDT V, BILLANT J. Multicriteria scheduling: theory, models and algorithms [M]. 2nd ed. Berlin, Germany; Springer, 2005.
  • 2ARMENTANO V, ARROYO J. An application of a multiobjective tabu search algorithm to a bicriteria flowshop problem [J]. Journal of Heuristics, 2003, 10(5):463-481.
  • 3VARADHARAJAN T, RAJENDRAN C. Multiobjective simulated annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs [J]. European Journal of Operational Research, 2005, 167(3):772-795.
  • 4ARROYO J, ARMENTANO V. Genetic local search for multiobjective flowshop scheduling problems [J]. European Journal of Operational Research, 2005, 167(3) :717-738.
  • 5SMITH K. Neural networks for combinatorial optimization; a review of more than a decade of research [J]. INFORMS Journal on Computing, 1999, 11(1): 15-34.
  • 6PATRICK R M. A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem [J]. International Journal of Production Economics, 2001, 72(1): 1990:59-71.
  • 7KOHONEN T. The self-organizing map[J]. Proceedings of the IEEE, 1990,78(9) :1464-1480.
  • 8YANG J, CHANG T. Multiobjective scheduling for IC sort and test with a simulation testbed[J]. IEEE Transactions on Semiconductor Manufacturing, 1998, 11(2): 304-315.
  • 9GUPTA J, TORRES A. Generating efficient schedules for identical parallel machines involving flow-time and tardy iobs [J]. European Journal of Operational Research, 2005, 167 (3) : 679-695.
  • 10HARAL U, CHEN R W, FERRELL W,et al. Multiobjective single machine scheduling with nontraditional requirements [J]. International Journal of Production Economics, 2007, 106(2):574-584.

同被引文献47

  • 1陶松桥,杨明忠.基于ERP与MES集成的车间生产计划和调度方法[J].机电工程技术,2005,34(6):64-65. 被引量:14
  • 2王延斌,王刚,赵立忠,高国安.基于蚁群算法的模具制造动态调度研究[J].计算机集成制造系统,2006,12(7):1028-1036. 被引量:9
  • 3朱双东,夏文明.基于神经网络的Job-Shop类调度问题[J].机电工程,2007,24(1):63-65. 被引量:3
  • 4王国新,宁汝新,王爱民.基于仿真的生产调度优化技术研究[J].计算机集成制造系统,2007,13(7):1419-1427. 被引量:31
  • 5Chin Soon Chong, Appa lyer Sivakumar, Robert Gay. Simulation-based scheduling for dynamic discrete manufacturing [A] . Proceedings of the 2003 Winter Simulation Conference (IEEE Cat. No.03CH7499) [C], 2003, 2: 1465-1473.
  • 6Miao, X Kleinman, D.L. Dynamic job scheduling with strict deadline [A] . Proceedings of the 29th IEEE Conference on Decision and Control (Cat. No.90CH2917-3) [C], 1990, 1: 116-121.
  • 7Chand, Suresh, Trauh, et al. Single-machine scheduling with dynamic arrivals: decomposition resuhs and an improved algorithm [J] . Naval Research Logistics, v43, n5, Aug, 1996: 709-719.
  • 8J.R.Jackson. Scheduling a Production Line to Minimize Maximum Tardiness, Research Report 43, Management Science Research Projects [R] . LosAngeles, USA: University of California, 1955.
  • 9W.E.Smith. Various optimizers for single stage production [J] . Naval Research Logistics Quarterly, 1956, 3: 59-66.
  • 10B.Giffler, G,L.Thompson. Algorithms for solving production scheduling problems [J] . Operations Research, 1960: 487- 503.

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部